Search Ctrl K
Home / Tools
THE FEUTEX TOOLKIT

Same-Day Delivery Route Economics

Evaluate delivery surcharge receipts against route labor, vehicle and failed-drop costs.

Ecommerce workspace● Runs in your browser
01 Your input
02 Your result
View or copy raw result data
FormulaSurcharge revenue = v.deliveries*v.surcharge ; Route cost = v.driver_hours*v.hourly+v.vehicle+v.deliveries*v.failed/100*v.failure_cost ; Net = v.deliveries*v.surcharge-v.driver_hours*v.hourly-v.vehicle-v.deliveries*v.failed/100*v.failure_cost
Sources and model references

Worked example

Inputs

Deliveries
60 orders
Surcharge
8 currency
Driver hours
8 hours
Hourly
25 currency
Vehicle
70 currency
Failed
5 %
Failure cost
10 currency

Expected results

Surcharge revenue
480 currency
Route cost
300 currency
Net
180 currency

Load the example in the workspace to reproduce these results. Display rounding does not change the underlying calculation.

How to use this tool

  1. Enter your own assumptions using a consistent currency and period.
  2. Review the scenario outputs and compare alternative inputs.
  3. Check the stated model limits before using the result in an operating plan.

Try this example

{
  "deliveries": 60,
  "surcharge": 8,
  "driver_hours": 8,
  "hourly": 25,
  "vehicle": 70,
  "failed": 5,
  "failure_cost": 10
}

Accuracy and scope

Deterministic planning scenario; inputs are assumptions, not forecasts. Excludes taxes, financing, legal requirements and costs not explicitly entered. Source explains the underlying planning framework; this specific scenario arithmetic is original.

Is my data uploaded?

This tool runs locally in your browser. Input and output are not sent to a processing server. Copy or download your result before leaving the page.