How to use this tool
- Enter your own assumptions using a consistent currency and period.
- Review the scenario outputs and compare alternative inputs.
- Check the stated model limits before using the result in an operating plan.
Try this example
{
"planned_minutes": 480,
"stop_minutes": 60,
"ideal_cycle": 0.5,
"total": 700,
"good": 665
}Accuracy and scope
OEE arithmetic assumes a valid ideal cycle time, consistent counts and a clearly defined planned-time window. Not a safety or quality certification.
Is my data uploaded?
This tool runs locally in your browser. Input and output are not sent to a processing server. Copy or download your result before leaving the page.