Search Ctrl K
Home / Tools
THE FEUTEX TOOLKIT

Manufacturing OEE Loss Breakdown

Separate availability, performance and quality losses from measured production data.

Supply Chain workspace● Runs in your browser
01 Your input
02 Your result
View or copy raw result data
FormulaAvailability = 100*(v.planned_minutes-v.stop_minutes)/v.planned_minutes ; Performance = 100*v.ideal_cycle*v.total/(v.planned_minutes-v.stop_minutes) ; Quality = 100*v.good/v.total ; Oee = 100*v.good*v.ideal_cycle/v.planned_minutes
Sources and model references

How to use this tool

  1. Enter your own assumptions using a consistent currency and period.
  2. Review the scenario outputs and compare alternative inputs.
  3. Check the stated model limits before using the result in an operating plan.

Try this example

{
  "planned_minutes": 480,
  "stop_minutes": 60,
  "ideal_cycle": 0.5,
  "total": 700,
  "good": 665
}

Accuracy and scope

OEE arithmetic assumes a valid ideal cycle time, consistent counts and a clearly defined planned-time window. Not a safety or quality certification.

Is my data uploaded?

This tool runs locally in your browser. Input and output are not sent to a processing server. Copy or download your result before leaving the page.