Search Ctrl K
Home / Tools
THE FEUTEX TOOLKIT

Kanban Container Count Plan

Estimate whole replenishment containers covering demand during lead time plus an explicit buffer.

Supply Chain workspace● Runs in your browser
01 Your input
02 Your result
View or copy raw result data
FormulaContainers = Math.ceil(v.demand_hour*v.lead_hours*(1+v.buffer/100)/v.container) ; Authorized inventory = Math.ceil(v.demand_hour*v.lead_hours*(1+v.buffer/100)/v.container)*v.container
Sources and model references

Worked example

Inputs

Demand hour
100 items/hour
Lead hours
3 hours
Buffer
20 %
Container
40 items

Expected results

Containers
9 items
Authorized inventory
360 items

Load the example in the workspace to reproduce these results. Display rounding does not change the underlying calculation.

How to use this tool

  1. Enter your own assumptions using a consistent currency and period.
  2. Review the scenario outputs and compare alternative inputs.
  3. Check the stated model limits before using the result in an operating plan.

Try this example

{
  "demand_hour": 100,
  "lead_hours": 3,
  "buffer": 20,
  "container": 40
}

Accuracy and scope

Deterministic planning scenario; inputs are assumptions, not forecasts. Excludes taxes, financing, legal requirements and costs not explicitly entered. Source explains the underlying planning framework; this specific scenario arithmetic is original.

Is my data uploaded?

This tool runs locally in your browser. Input and output are not sent to a processing server. Copy or download your result before leaving the page.