Search Ctrl K
Home / Tools
THE FEUTEX TOOLKIT

Cycle Counting Workload Plan

Schedule count workload for three inventory classes with different annual count frequencies.

Supply Chain workspace● Runs in your browser
01 Your input
02 Your result
View or copy raw result data
FormulaAnnual counts = v.class_a*v.freq_a+v.class_b*v.freq_b+v.class_c*v.freq_c ; Daily hours = (v.class_a*v.freq_a+v.class_b*v.freq_b+v.class_c*v.freq_c)*v.minutes/60/v.workdays
Sources and model references

Worked example

Inputs

Class a
200 items
Freq a
12 counts/year
Class b
500 items
Freq b
4 counts/year
Class c
1000 items
Freq c
1 counts/year
Minutes
3 minutes/count
Workdays
250 days

Expected results

Annual counts
5400 counts
Daily hours
1.08 hours/day

Load the example in the workspace to reproduce these results. Display rounding does not change the underlying calculation.

How to use this tool

  1. Enter your own assumptions using a consistent currency and period.
  2. Review the scenario outputs and compare alternative inputs.
  3. Check the stated model limits before using the result in an operating plan.

Try this example

{
  "class_a": 200,
  "freq_a": 12,
  "class_b": 500,
  "freq_b": 4,
  "class_c": 1000,
  "freq_c": 1,
  "minutes": 3,
  "workdays": 250
}

Accuracy and scope

Deterministic planning scenario; inputs are assumptions, not forecasts. Excludes taxes, financing, legal requirements and costs not explicitly entered. Source explains the underlying planning framework; this specific scenario arithmetic is original.

Is my data uploaded?

This tool runs locally in your browser. Input and output are not sent to a processing server. Copy or download your result before leaving the page.