Earned Value Project Health

Assess cost and schedule performance from planned value, earned value and actual cost.

Projects workspace● Runs in your browser
01 Your input
02 Your result
View or copy raw result data
FormulaCost variance = v.earned-v.actual ; Schedule variance = v.earned-v.planned ; Cost index = v.earned/v.actual ; Schedule index = v.earned/v.planned
Sources and model references

How to use this tool

  1. Enter your own assumptions using a consistent currency and period.
  2. Review the scenario outputs and compare alternative inputs.
  3. Check the stated model limits before using the result in an operating plan.

Try this example

{
  "planned": 50000,
  "earned": 45000,
  "actual": 48000
}

Accuracy and scope

Deterministic planning scenario; inputs are assumptions, not forecasts. Excludes taxes, financing, legal requirements and costs not explicitly entered. Source explains the underlying planning framework; this specific scenario arithmetic is original.

Is my data uploaded?

This tool runs locally in your browser. Input and output are not sent to a processing server. Copy or download your result before leaving the page.