Search Ctrl K
Home / Tools
THE FEUTEX TOOLKIT

Supplier Quality-Adjusted Quote

Include expected scrap and inspection costs when comparing two supplier quotes.

Supply Chain workspace● Runs in your browser
01 Your input
02 Your result
View or copy raw result data
FormulaSupplier a total = v.quantity*(v.a_price+v.a_defects/100*v.failure_cost)+v.inspection_a ; Supplier b total = v.quantity*(v.b_price+v.b_defects/100*v.failure_cost)+v.inspection_b
Sources and model references

Worked example

Inputs

Quantity
10000 items
A price
5 currency
A defects
2 %
B price
5.2 currency
B defects
0.5 %
Failure cost
20 currency
Inspection a
500 currency
Inspection b
200 currency

Expected results

Supplier a total
54500 currency
Supplier b total
53200 currency

Load the example in the workspace to reproduce these results. Display rounding does not change the underlying calculation.

How to use this tool

  1. Enter your own assumptions using a consistent currency and period.
  2. Review the scenario outputs and compare alternative inputs.
  3. Check the stated model limits before using the result in an operating plan.

Try this example

{
  "quantity": 10000,
  "a_price": 5,
  "a_defects": 2,
  "b_price": 5.2,
  "b_defects": 0.5,
  "failure_cost": 20,
  "inspection_a": 500,
  "inspection_b": 200
}

Accuracy and scope

Deterministic planning scenario; inputs are assumptions, not forecasts. Excludes taxes, financing, legal requirements and costs not explicitly entered. Source explains the underlying planning framework; this specific scenario arithmetic is original.

Is my data uploaded?

This tool runs locally in your browser. Input and output are not sent to a processing server. Copy or download your result before leaving the page.