Search Ctrl K
Home / Tools
THE FEUTEX TOOLKIT

Demand-Variability Safety Stock

Estimate a buffer from independent daily demand variation and fixed replenishment lead time.

Supply Chain workspace● Runs in your browser
01 Your input
02 Your result
View or copy raw result data
FormulaSafety units = Math.ceil(v.z*v.daily_sigma*Math.sqrt(v.lead_days)) ; Buffer value = Math.ceil(v.z*v.daily_sigma*Math.sqrt(v.lead_days))*v.unit_cost
Sources and model references

Worked example

Inputs

Daily sigma
12 items/day
Lead days
9 days
Z
1.645 standard deviations
Unit cost
20 currency

Expected results

Safety units
60 items
Buffer value
1200 currency

Load the example in the workspace to reproduce these results. Display rounding does not change the underlying calculation.

How to use this tool

  1. Enter your own assumptions using a consistent currency and period.
  2. Review the scenario outputs and compare alternative inputs.
  3. Check the stated model limits before using the result in an operating plan.

Try this example

{
  "daily_sigma": 12,
  "lead_days": 9,
  "z": 1.645,
  "unit_cost": 20
}

Accuracy and scope

Normal approximation with independent daily demand and fixed lead time. User supplies z; no service-level guarantee or lead-time variability is modeled.

Is my data uploaded?

This tool runs locally in your browser. Input and output are not sent to a processing server. Copy or download your result before leaving the page.