THE FEUTEX TOOLKIT

Production Material Purchase Plan

Translate a production target and raw-material buffer into purchase quantities and cash needs.

Supply Chain workspace● Runs in your browser
01 Your input
02 Your result
View or copy raw result data
FormulaMaterial to buy = Math.max(0,v.production*v.material_each+v.ending-v.opening) ; Purchase cost = Math.max(0,v.production*v.material_each+v.ending-v.opening)*v.price
Sources and model references

Worked example

Inputs

Production
1000 items
Material each
2.5 material units
Opening
800 material units
Ending
500 material units
Price
4 currency/material unit

Expected results

Material to buy
2200 material units
Purchase cost
8800 currency

Load the example in the workspace to reproduce these results. Display rounding does not change the underlying calculation.

How to use this tool

  1. Enter your own assumptions using a consistent currency and period.
  2. Review the scenario outputs and compare alternative inputs.
  3. Check the stated model limits before using the result in an operating plan.

Try this example

{
  "production": 1000,
  "material_each": 2.5,
  "opening": 800,
  "ending": 500,
  "price": 4
}

Accuracy and scope

Deterministic planning scenario; inputs are assumptions, not forecasts. Excludes taxes, financing, legal requirements and costs not explicitly entered. Source explains the underlying planning framework; this specific scenario arithmetic is original.

Is my data uploaded?

This tool runs locally in your browser. Input and output are not sent to a processing server. Copy or download your result before leaving the page.