Search Ctrl K
Home / Tools
THE FEUTEX TOOLKIT

Billable Hours Target Gap

Calculate billable hours still needed to achieve a monthly utilization target.

Business workspace● Runs in your browser
01 Your input
02 Your result
View or copy raw result data
FormulaRemaining = Math.max(0,available*target/100-billed); Daily needed = Math.max(0,available*target/100-billed)/days_left

Made for real tasks

  • Calculate billable hours still needed to achieve a monthly utilization target.
  • Compare a revised operating scenario with the current plan.
Explore step-by-step workflows →

Worked example

Inputs

Available
160 hours
Target
70 %
Billed
80 hours
Days left
8 days

Expected results

Remaining
32 hours
Daily needed
4 hours/day

Load the example in the workspace to reproduce these results. Display rounding does not change the underlying calculation.

How to use this tool

  1. Enter the measured quantities and planning assumptions in the displayed units.
  2. Run the calculation, then compare the result with your available capacity or actual records.
  3. Change one assumption at a time to compare operating scenarios.

Try this example

{
  "available": 160,
  "target": 70,
  "billed": 80,
  "days_left": 8
}

Accuracy and scope

Monthly available hours and billed hours use the same reporting basis. Target gap floors at zero; daily figure is an average over remaining days.

Is my data uploaded?

This tool runs locally in your browser. Input and output are not sent to a processing server. Copy or download your result before leaving the page.