How to use this tool
- Enter the measured quantities and planning assumptions in the displayed units.
- Run the calculation, then compare the result with your available capacity or actual records.
- Change one assumption at a time to compare operating scenarios.
Try this example
{
"total": 100,
"small": 25,
"medium": 45
}Accuracy and scope
Uses floor allocation for small and medium; all rounding residual goes to large. Enter a whole order quantity.
Is my data uploaded?
This tool runs locally in your browser. Input and output are not sent to a processing server. Copy or download your result before leaving the page.