How to use this tool
- Enter the measured quantities and planning assumptions in the displayed units.
- Run the calculation, then compare the result with your available capacity or actual records.
- Change one assumption at a time to compare operating scenarios.
Try this example
{
"a_units": 100,
"a_minutes": 2,
"b_units": 50,
"b_minutes": 3,
"changeover": 40,
"available": 420
}Accuracy and scope
Fixed order quantities, one shared machine and entered total changeover; no product-mix optimization.
Is my data uploaded?
This tool runs locally in your browser. Input and output are not sent to a processing server. Copy or download your result before leaving the page.