How to use this tool
- Enter the measured quantities and planning assumptions in the displayed units.
- Run the calculation, then compare the result with your available capacity or actual records.
- Change one assumption at a time to compare operating scenarios.
Try this example
{
"shift_hours": 8,
"break_minutes": 60,
"demand": 420
}Accuracy and scope
Demand is finished units per shift and the available window excludes breaks; takt is customer pacing, not measured machine cycle time.
Is my data uploaded?
This tool runs locally in your browser. Input and output are not sent to a processing server. Copy or download your result before leaving the page.