Search Ctrl K
Home / Tools
THE FEUTEX TOOLKIT

Two-Project Capital Budget Fit

Compare available funding with two independent project outlays and quantify the unfunded gap.

Finance workspace● Runs in your browser
01 Your input
02 Your result
View or copy raw result data
FormulaAvailable = Math.max(0,v.budget-v.reserve) ; Funding gap = Math.max(0,v.project_a+v.project_b-v.budget+v.reserve) ; Remaining after a = v.budget-v.reserve-v.project_a
Sources and model references

Worked example

Inputs

Budget
150000 currency
Project a
90000 currency
Project b
80000 currency
Reserve
10000 currency

Expected results

Available
140000 currency
Funding gap
30000 currency
Remaining after a
50000 currency

Load the example in the workspace to reproduce these results. Display rounding does not change the underlying calculation.

How to use this tool

  1. Enter your own assumptions using a consistent currency and period.
  2. Review the scenario outputs and compare alternative inputs.
  3. Check the stated model limits before using the result in an operating plan.

Try this example

{
  "budget": 150000,
  "project_a": 90000,
  "project_b": 80000,
  "reserve": 10000
}

Accuracy and scope

Funding feasibility only; does not rank project value, risk, strategic importance or financing choices.

Is my data uploaded?

This tool runs locally in your browser. Input and output are not sent to a processing server. Copy or download your result before leaving the page.