Render Farm Deadline Planner

Estimate render duration and minimum workers for a fixed deadline.

Video workspace● Runs in your browser
01 Your input
02 Your result
View or copy raw result data
FormulaExpected render duration = frames*seconds/(3600*workers*eff/100); Workers needed for deadline = ceil(frames*seconds/(3600*deadline*eff/100))

Worked example

Inputs

Frames to render
1200 frames
Seconds per frame per worker
60 s
Available workers
10 workers
Parallel efficiency
80 %
Deadline
2 h

Expected results

Expected render duration
2.5 h
Workers needed for deadline
13 workers

Load the example in the workspace to reproduce these results. Display rounding does not change the underlying calculation.

How to use this tool

  1. Estimate render duration and minimum workers for a fixed deadline.
  2. Set frames to render, seconds per frame per worker, available workers, parallel efficiency, deadline in the indicated units.
  3. Calculate and compare expected render duration, workers needed for deadline.

Try this example

{
  "frames": 1200,
  "seconds": 60,
  "workers": 10,
  "eff": 80,
  "deadline": 2
}

Accuracy and scope

Idealized educational model. Enter measured values in the displayed units; real systems may require additional corrections.

Is my data uploaded?

This tool runs locally in your browser. Input and output are not sent to a processing server. Copy or download your result before leaving the page.