How to use this tool
- Enter the measured quantities and planning assumptions in the displayed units.
- Run the calculation, then compare the result with your available capacity or actual records.
- Change one assumption at a time to compare operating scenarios.
Try this example
{
"pieces": 3000,
"before": 40,
"after": 15,
"setup": 30,
"rate": 24
}Accuracy and scope
Before and after timing must cover equivalent measurements. Fixture setup occurs once per batch; capital purchase and validation are excluded.
Is my data uploaded?
This tool runs locally in your browser. Input and output are not sent to a processing server. Copy or download your result before leaving the page.