How to use this tool
- Enter the measured quantities and your own planning assumptions.
- Review all calculated outputs and the stated limitations.
Try this example
{
"hours": 10,
"hourly": 3,
"cap": 20,
"day_rate": 18,
"block_hours": 24
}Accuracy and scope
Assumes elapsed blocks of the supplied duration, a cap per block and unrounded hourly charges. Actual calendar-day and started-hour rules may differ.
Is my data uploaded?
This tool runs locally in your browser. Input and output are not sent to a processing server. Copy or download your result before leaving the page.