Search Ctrl K
Home / Tools
THE FEUTEX TOOLKIT

Multi-Stop Loading Cutoff Budget

Calculate the latest loading start from departure time and staging work.

Logistics workspace● Runs in your browser
01 Your input
02 Your result
View or copy raw result data
FormulaLoading minutes = pallets*minutes_per_pallet+paperwork; Start hour = departure_hour-(pallets*minutes_per_pallet+paperwork+buffer)/60

Made for real tasks

  • Calculate the latest loading start from departure time and staging work.
  • Compare a revised operating scenario with the current plan.
Explore step-by-step workflows →

Worked example

Inputs

Departure hour
14 hour after midnight
Pallets
24 pallets
Minutes per pallet
3 minutes/pallet
Paperwork
18 minutes
Buffer
30 minutes

Expected results

Loading minutes
90 minutes
Start hour
12 hour after midnight

Load the example in the workspace to reproduce these results. Display rounding does not change the underlying calculation.

How to use this tool

  1. Enter the measured quantities and planning assumptions in the displayed units.
  2. Run the calculation, then compare the result with your available capacity or actual records.
  3. Change one assumption at a time to compare operating scenarios.

Try this example

{
  "departure_hour": 14,
  "pallets": 24,
  "minutes_per_pallet": 3,
  "paperwork": 18,
  "buffer": 30
}

Accuracy and scope

Negative start hours mean the previous day. Does not optimize a route or apply driver regulations.

Is my data uploaded?

This tool runs locally in your browser. Input and output are not sent to a processing server. Copy or download your result before leaving the page.