How to use this tool
- Enter your own assumptions using a consistent currency and period.
- Review the scenario outputs and compare alternative inputs.
- Check the stated model limits before using the result in an operating plan.
Try this example
{
"new_equipment": 50000,
"old_sale": 10000,
"installation": 5000,
"old_running": 18000,
"new_running": 7000
}Accuracy and scope
Deterministic planning scenario; inputs are assumptions, not forecasts. Excludes taxes, financing, legal requirements and costs not explicitly entered. Source explains the underlying planning framework; this specific scenario arithmetic is original.
Is my data uploaded?
This tool runs locally in your browser. Input and output are not sent to a processing server. Copy or download your result before leaving the page.