Search Ctrl K
Home / Tools
THE FEUTEX TOOLKIT

Dehumidifier Collection Tank Timing

Estimate tank-emptying intervals from observed condensate production and chosen fill margin.

Home workspace● Runs in your browser
01 Your input
02 Your result
View or copy raw result data
FormulaObserved collection rate = collected/hours; Estimated emptying interval = tank*(1-reserve/100)/(collected/hours); Working tank volumes in runtime = run*collected/hours/(tank*(1-reserve/100))

Made for real tasks

  • Estimate tank-emptying intervals from observed condensate production and chosen fill margin.
  • Compare an alternative set of measurements without uploading personal data.
Explore step-by-step workflows →

Worked example

Inputs

Tank capacity
2.5 L
Unfilled margin
10 %
Observed collected water
1.8 L
Observation period
12 h
Planned runtime
24 h

Expected results

Observed collection rate
0.15 L/h
Estimated emptying interval
15 h
Working tank volumes in runtime
1.6 tanks

Load the example in the workspace to reproduce these results. Display rounding does not change the underlying calculation.

How to use this tool

  1. Enter tank capacity, unfilled margin, observed collected water, observation period, and planned runtime in the displayed units.
  2. Calculate and use each labeled result for dehumidifier collection tank timing. Compare the result with a measured sample before committing materials.

Try this example

{
  "tank": 2.5,
  "reserve": 10,
  "collected": 1.8,
  "hours": 12,
  "run": 24
}

Accuracy and scope

Assumes the observed rate persists; does not predict humidity, prevent overflow or replace automatic shutoff checks.

Is my data uploaded?

This tool runs locally in your browser. Input and output are not sent to a processing server. Copy or download your result before leaving the page.